UPDATES - SCROLL

FINAL CERTIFIED FAIR REPORT SHOULD BE SUBMITTED ON OR BEFORE 27/03/2015, 9.30 AM

Monday, 23 March 2015

PROJECT REPORT SUBMISSION DATE EXTENDED TO 27-03-2015, 9.30 AM

THE FINAL REPORT SUBMISSION DATE FOR S6 CS STUDENTS IS EXTENDED TO 27-03-2015. ALL GROUP SHOULD SUBMIT THEIR REPORT ON OR BEFORE THE PRESCRIBED DATE AT 9.30 AM IN THE MORNING.

Sunday, 22 March 2015

PROJECT REPORT BACK COVER PAGE LAYOUT

In order to improve the project report outlook the back cover page can be modelled as in the given format with the passport size pictures and details of group members and project guide.
Note: The picture should be standard passport size photo.

pictures of guides can be either collected directly from respective guides or can be downloaded from college website. (load the site www.cectl.ac.in . Then select the DEPARTMENT tab. In DEPARTMENT menu , click on COMPUTER SCIENCE & ENGINEERING. Now a new sub window is launched. Click on the FACULTY link in sub window. Now you can see a list of faculties. Click on the name of your guide. now you can see their photo. Place the mouse over the photo of your guide and right click on your mouse. Now you can see the option SAVE image as. Just save the image in your system.

click here to view project report back cover page layout

Saturday, 21 March 2015

S6 CS B BATCH FINAL REVIEW on 19, 20th OF MARCH, MARKS

Mark division
Presentation -10
Report -15
Effort or Individual work- 20
Output- 10
Viva -25
Project Diary-20


Note: This is not your total internal mark. Your total internal mark is the average of first review marks+second review marks+ final review marks +project final report mark

No Name Topic
Total in 100
1 Rithul Kumar S CLOUDMOV: CLOUD BASED MOBILE SOCIAL TV(Fathima)   75
Soumya V   76
Sravana S Prabhu   76
2 Krishnendu S EASY LIBRARY (Judy)   44
Muhammed Faizal   72
Nasibha K T   67
Sreeraj R   59
3 Abhijith Ajithkumar CECAPP (Fathima)   75
Abhishek Ramachandran   77
Athul K S   68
Senobin Basil   75
4 Devi B MOBILE LOCATION ALARM (Josna)   68
Noushad N   76
Sufna S S   61
vishnu V   63
5 Akshay K Reghu ATTENDANCE MANAGEMENT SYSTEM (Rohini)   18
Ananthakrishnan B   30
Arunjith Ravi   34
Vishnu Ravi   40
6 Akhil G 8085 ANDROID EMULATOR (Athira)   59
Bibin Raj   90
Rahman Khalid   59
Anjana B   71
7 Agna M S PERSUASIVE CUED - CLICK POINT (Pramod)   63
Aiswarya Narayanan   64
Meenu Muraleedharan   58
Saritha M S   60
8 Arathy K U LAND SURVEYOR (Pramod)   56
Divya M Kumar   90
Hasnamol C M   56
Jishy Johnson   90
9 Rajeev P N BINGO MULTIPLAYER USING WIFI (Asha)   74
Sudheesh V   75
Harsha G   50
Sikha Sasidharan   51
10 Harivishnu R MY TUTOR (Asha)   41
Vishnujith N   45
Anjali A Palayi   47
Surabhi Suresh   48
11 Karthik B AUTODOC (Asha)   78
Mirza Zacharia K Z   72
Amritha K   86
Maria Antony   74

Thursday, 19 March 2015

S6 CS A FINAL REVIEW on 17,18 th of March MARKS

Mark division
Presentation -10
Report -15
Effort or Individual work- 20
Output- 10
Viva -25
Project Diary-20




Name













Topic












total (100)
Archit M D METAMORPHIC CRYPTOGRAPHY              ( Joyce) 66
Kukku Suresh 56
Naziya Noushad 64
Vidya O Kuttan 57

Adhil K
PUZZLE MASTER (Aswathy)
78
Ashik K 76
Lijin Raj 51
Vishnu satheeshan 69

Amal J
COLLEGE KNOWLEDGE MANAGEMENT SYSTEM (Meenu )
78
Aiswarya Saseendran 69
Anjali S Varier 82
Raina T A 83

M. Arjun
EMERGENCY HELPER (Aswathy)
60
Hemanth P V 60
Sivanand D 64
Sreejith K U 57

Abhijith K S
CEC EXAM HALL ARRANGEMENT (Janu Miss)
63
Arun C Bose 92
Deepak Prakash 68
Sujith R Nath 63

Krishna K R
TRAFFIC FREE DRIVE -(Josna)
51
Osni Therasa V X 50
Sruthi P 51
Telin Tom 50

Deepthi M P
VIRTUAL EXAM (Pramod)
91
Neena A T 94
Neethu Elizabeth Punnoose 94
Neethu Moidu 86

Aingel Rajan
RESULT ANALYSIS (Aswathy)
51
Aneesha Nazer 50
Sajeeha K T 51
Sayujya Jayakumar 57

Akhila S
RESERVATION BASED SMART PARKING SYSTEM (Rohini)
81
Amrutha P U 77
Jusna P Kumar 82
Shiyana S 75

Ganga Sreekumar
TIME TABLE SCHEDULE GENERATION (Pramod)
60
Meera Roy 37
Reshma Raj R 61
Sujisha S 50

Beena Christy
CEC ADMISSION  DESK (Rohini)
57
Divya B 57
Haritha 61

Note: This is not your total internal mark. Your total internal mark is the average of first review marks+second review marks+ final review marks +project final report mark

PROJECT REPORT FRONT COVER DESIGN


Each group should design their project report cover page in photoshop or any other graphic software. The cover page should be done as in the given sample. Make the title as "B. TECH MINI PROJECT REPORT"  

Then add your PROJECT TITLE in upper case.
Then your name in upper case. (individual reports)

The background picture should be meaningful and relevant according to their own project titles. The cover page should be designed with high resolution image so that the picture quality will be good after laser printing. 

For department copy, library copy and guide copy the name of all group members should be used in the cover page.

To view sample report meet your coordinator

CLICK HERE FOR SAMPLE FRONT COVER DESIGNS

Wednesday, 18 March 2015

FINAL FAIR REPORT SUBMISSION ON OR BEFORE 25/03/2015

FINAL FAIR REPORT AND DVD SUBMISSION SHOULD BE  DONE ON OR BEFORE 25/03/2015.  THE FAIR REPORT SHOULD STRICTLY FOLLOW THE "FINAL HARD COPY REPORT SAMPLE" . (CHECK THE PREVIOUS POST FOR DETAILS). ANY VIOLATION IN THE ABOVE SAID RESULT MAY LEAD TO REPRINTING OR REBINDING. 

NOTE: YOU CANNOT SAY THE EXCUSE THAT GUIDE APPROVED, SO WE PRINTED. ITS THE DUTY OF EACH MEMBER TO ENSURE THAT THEIR PROJECT REPORT MEET THE STANDARD REQUIREMENTS AS PROVIDED IN THE "FINAL HARD COPY REPORT SAMPLE" AS WELL AS THE VARIOUS INSTRUCTIONS PROVIDED BY THE PROJECT COORDINATOR EARLIER ABOUT CHAPTER CONTENTS AND ALIGNMENTS. 

FOR ANY QUERIES :CONTACT PROJECT COORDINATOR 9496881321

Tuesday, 17 March 2015

FINAL HARD COPY REPORT SAMPLE

Do the alignments, borders, certificate page, front sheets etc as in the following report. Its similar to old reports except certificate page.

MODIFY THE CERTIFICATE AS IN THIS SAMPLE REPORT.


DOWNLOAD FINAL REPORT SAMPLE

For any queries / doubts contact 9496881321(Pramod)