UPDATES - SCROLL

FINAL CERTIFIED FAIR REPORT SHOULD BE SUBMITTED ON OR BEFORE 27/03/2015, 9.30 AM

Monday 30 March 2015

S6 CS A & B BATCH FINAL ATTENDANCE

COCHIN UNIVERSITY OF SCIENCE AND TECHNOLOGY
OFFICE OF THE CONTROLLER OF EXAMINATIONS
ATTENDENCE STATEMENT
College College Of Engineering Cherthala
Name of Exam B-Tech Degree VI Semester Examination March 2015
Branch Computer Science & Engineering
Total Number of Working Days 77
 
Sl.No. Reg. No. Name No. of Days Attended % of Attendance Remarks
1 12133600 ABHIJITH AJITHKUMAR 71.5 93  
2 12133601 ABHIJITH K.S. 71 92  
3 12133602 ABHISHEK RAMACHANDRAN 71.5 93  
4 12133603 ADHIL K. 58.5 76  
5 12133604 AKHIL G. 59 77  
6 12133605 AKSHAY K. REGHU 46.5 60  
7 12133606 AMAL J. 63.5 82  
8 12133607 ANANTHAKRISHNAN B. 59 77  
9 12133609 ARCHIT M.D. 59.5 77  
10 12133610 ARUNJITH RAVI 61 79  
11 12133611 ASHIK K. 69 90  
12 12133612 ATHUL K.S. 68 88  
13 12133613 BIBIN RAJ B.S. 66 86  
14 12133614 DEEPAK PRAKASH 64 83  
15 12133615 HARI VISHNU R. 55 71  
16 12133616 HEMANTH P.V. 65.5 85  
17 12133617 KARTHIK B. 71.5 93  
18 12133618 LIJIN RAJ T. 60 78  
19 12133619 M. ARJUN 61.5 80  
20 12133620 MIRZA ZACHARIA K.Z. 72 94  
21 12133621 MUHAMMED FAIZAL 52.5 68  
22 12133622 RAHMAN KHALID 62 81  
23 12133623 RAJEEV P.N. 66.5 86  
24 12133624 RITHUL KUMAR S. 58.5 76  
25 12133627 SENOBIN BASIL 69 90  
26 12133628 SIVANAND D. 62 81  
27 12133629 SREEJITH K.U. 60.5 79  
28 12133630 SREERAG R. 60 78  
29 12133631 SUDHEESH V. 68 88  
30 12133633 VISHNU RAVI 55.5 72  
31 12133634 VISHNU SATHEESAN 69.5 90  
32 12133635 VISHNUJITH N. 58 75  
33 12133636 A.H. NAZIYA NOUSHAD 68.5 89  
34 12133637 AGNA M.S. 65 84  
35 12133638 AINGEL RAJAN 63 82  
36 12133639 AISWARYA NARAYANAN 64 83  
37 12133640 AISWARYA SASEENDRAN 68 88  
38 12133641 AKHILA S. 70 91  
39 12133642 AMRITHA K. 67.5 88  
40 12133643 AMRITHA P.U. 69 90  
41 12133644 ANEESHA NASSER 66 86  
42 12133645 ANJALI A PALAYI 62.5 81  
43 12133646 ANJALI S. VARIER 69 90  
44 12133647 ANJANA B. 68 88  
45 12133648 ARATHY K.U. 62 81  
46 12133649 BEENA CHRISTY 70.5 92  
47 12133650 DEVI B. 64.5 84  
48 12133651 DIVYA B. 74 96  
49 12133652 DIVYA M. KUMAR 68.5 89  
50 12133653 GANGA SREEKUMAR 62.5 81  
51 12133654 HARITHA S. 73.5 95  
52 12133655 HASNAMOL C.M. 65 84  
53 12133656 JISHY JOHNSON 66 86  
54 12133657 JUSNA P. KUMAR 70 91  
55 12133658 KRISHNA K.R. 61 79  
56 12133659 KRISHNENDU S. 66 86  
57 12133660 MARIA ANTONY 71 92  
58 12133661 MEENU MURALEEDHARAN 62 81  
59 12133662 MEERA ROY 65.5 85  
60 12133663 NASHIBA K.T. 56.5 73  
61 12133664 NEENA A.T. 66 86  
62 12133665 NEETHU ELIZABETH PUNNOOSE 67.5 88  
63 12133666 OSNI THERESA V.X. 67 87  
64 12133667 RAINA T.A. 71.5 93  
65 12133668 RESHMA RAJ R. 61.5 80  
66 12133669 SAJEEHA K.T. 58.5 76  
67 12133670 SARITHA M.S. 64 83  
68 12133671 SAYUJYA JAYAKUMAR 71 92  
69 12133672 SHIYANA S. 71.5 93  
70 12133673 SIKHA SASIDHARAN 69.5 90  
71 12133674 SRAVANA S PRABHU 67 87  
72 12133675 SRUTHI P. 61 79  
73 12133676 SUFNA S.S. 65.5 85  
74 12133677 SUJISHA S. 58.5 76  
75 12133678 SURABHI SURESH 65.5 85  
76 12133679 TELIN TOM 64 83  
77 12133680 VIDYA O. KUTTAN 69 90  
78 12133682 ARUN C. BOSE 67 87  
79 12133683 NOUSHAD N. 60.5 79  
80 12133684 SUJITH R. NATH 58.5 76  
81 12133685 VISHNU V. 63 82  
82 12133686 DEEPTHI M.P. 71 92  
83 12133687 HARSHA G. 68.5 89  
84 12133688 KUKKU SURESH 62.5 81  
85 12133689 NEETHU MOIDU 67.5 88  
86 12133690 SOUMYA V. 67.5 88  

Monday 23 March 2015

PROJECT REPORT SUBMISSION DATE EXTENDED TO 27-03-2015, 9.30 AM

THE FINAL REPORT SUBMISSION DATE FOR S6 CS STUDENTS IS EXTENDED TO 27-03-2015. ALL GROUP SHOULD SUBMIT THEIR REPORT ON OR BEFORE THE PRESCRIBED DATE AT 9.30 AM IN THE MORNING.

Sunday 22 March 2015

PROJECT REPORT BACK COVER PAGE LAYOUT

In order to improve the project report outlook the back cover page can be modelled as in the given format with the passport size pictures and details of group members and project guide.
Note: The picture should be standard passport size photo.

pictures of guides can be either collected directly from respective guides or can be downloaded from college website. (load the site www.cectl.ac.in . Then select the DEPARTMENT tab. In DEPARTMENT menu , click on COMPUTER SCIENCE & ENGINEERING. Now a new sub window is launched. Click on the FACULTY link in sub window. Now you can see a list of faculties. Click on the name of your guide. now you can see their photo. Place the mouse over the photo of your guide and right click on your mouse. Now you can see the option SAVE image as. Just save the image in your system.

click here to view project report back cover page layout

Saturday 21 March 2015

S6 CS B BATCH FINAL REVIEW on 19, 20th OF MARCH, MARKS

Mark division
Presentation -10
Report -15
Effort or Individual work- 20
Output- 10
Viva -25
Project Diary-20


Note: This is not your total internal mark. Your total internal mark is the average of first review marks+second review marks+ final review marks +project final report mark

No Name Topic
Total in 100
1 Rithul Kumar S CLOUDMOV: CLOUD BASED MOBILE SOCIAL TV(Fathima)   75
Soumya V   76
Sravana S Prabhu   76
2 Krishnendu S EASY LIBRARY (Judy)   44
Muhammed Faizal   72
Nasibha K T   67
Sreeraj R   59
3 Abhijith Ajithkumar CECAPP (Fathima)   75
Abhishek Ramachandran   77
Athul K S   68
Senobin Basil   75
4 Devi B MOBILE LOCATION ALARM (Josna)   68
Noushad N   76
Sufna S S   61
vishnu V   63
5 Akshay K Reghu ATTENDANCE MANAGEMENT SYSTEM (Rohini)   18
Ananthakrishnan B   30
Arunjith Ravi   34
Vishnu Ravi   40
6 Akhil G 8085 ANDROID EMULATOR (Athira)   59
Bibin Raj   90
Rahman Khalid   59
Anjana B   71
7 Agna M S PERSUASIVE CUED - CLICK POINT (Pramod)   63
Aiswarya Narayanan   64
Meenu Muraleedharan   58
Saritha M S   60
8 Arathy K U LAND SURVEYOR (Pramod)   56
Divya M Kumar   90
Hasnamol C M   56
Jishy Johnson   90
9 Rajeev P N BINGO MULTIPLAYER USING WIFI (Asha)   74
Sudheesh V   75
Harsha G   50
Sikha Sasidharan   51
10 Harivishnu R MY TUTOR (Asha)   41
Vishnujith N   45
Anjali A Palayi   47
Surabhi Suresh   48
11 Karthik B AUTODOC (Asha)   78
Mirza Zacharia K Z   72
Amritha K   86
Maria Antony   74

Thursday 19 March 2015

S6 CS A FINAL REVIEW on 17,18 th of March MARKS

Mark division
Presentation -10
Report -15
Effort or Individual work- 20
Output- 10
Viva -25
Project Diary-20




Name













Topic












total (100)
Archit M D METAMORPHIC CRYPTOGRAPHY              ( Joyce) 66
Kukku Suresh 56
Naziya Noushad 64
Vidya O Kuttan 57

Adhil K
PUZZLE MASTER (Aswathy)
78
Ashik K 76
Lijin Raj 51
Vishnu satheeshan 69

Amal J
COLLEGE KNOWLEDGE MANAGEMENT SYSTEM (Meenu )
78
Aiswarya Saseendran 69
Anjali S Varier 82
Raina T A 83

M. Arjun
EMERGENCY HELPER (Aswathy)
60
Hemanth P V 60
Sivanand D 64
Sreejith K U 57

Abhijith K S
CEC EXAM HALL ARRANGEMENT (Janu Miss)
63
Arun C Bose 92
Deepak Prakash 68
Sujith R Nath 63

Krishna K R
TRAFFIC FREE DRIVE -(Josna)
51
Osni Therasa V X 50
Sruthi P 51
Telin Tom 50

Deepthi M P
VIRTUAL EXAM (Pramod)
91
Neena A T 94
Neethu Elizabeth Punnoose 94
Neethu Moidu 86

Aingel Rajan
RESULT ANALYSIS (Aswathy)
51
Aneesha Nazer 50
Sajeeha K T 51
Sayujya Jayakumar 57

Akhila S
RESERVATION BASED SMART PARKING SYSTEM (Rohini)
81
Amrutha P U 77
Jusna P Kumar 82
Shiyana S 75

Ganga Sreekumar
TIME TABLE SCHEDULE GENERATION (Pramod)
60
Meera Roy 37
Reshma Raj R 61
Sujisha S 50

Beena Christy
CEC ADMISSION  DESK (Rohini)
57
Divya B 57
Haritha 61

Note: This is not your total internal mark. Your total internal mark is the average of first review marks+second review marks+ final review marks +project final report mark

PROJECT REPORT FRONT COVER DESIGN


Each group should design their project report cover page in photoshop or any other graphic software. The cover page should be done as in the given sample. Make the title as "B. TECH MINI PROJECT REPORT"  

Then add your PROJECT TITLE in upper case.
Then your name in upper case. (individual reports)

The background picture should be meaningful and relevant according to their own project titles. The cover page should be designed with high resolution image so that the picture quality will be good after laser printing. 

For department copy, library copy and guide copy the name of all group members should be used in the cover page.

To view sample report meet your coordinator

CLICK HERE FOR SAMPLE FRONT COVER DESIGNS

Wednesday 18 March 2015

FINAL FAIR REPORT SUBMISSION ON OR BEFORE 25/03/2015

FINAL FAIR REPORT AND DVD SUBMISSION SHOULD BE  DONE ON OR BEFORE 25/03/2015.  THE FAIR REPORT SHOULD STRICTLY FOLLOW THE "FINAL HARD COPY REPORT SAMPLE" . (CHECK THE PREVIOUS POST FOR DETAILS). ANY VIOLATION IN THE ABOVE SAID RESULT MAY LEAD TO REPRINTING OR REBINDING. 

NOTE: YOU CANNOT SAY THE EXCUSE THAT GUIDE APPROVED, SO WE PRINTED. ITS THE DUTY OF EACH MEMBER TO ENSURE THAT THEIR PROJECT REPORT MEET THE STANDARD REQUIREMENTS AS PROVIDED IN THE "FINAL HARD COPY REPORT SAMPLE" AS WELL AS THE VARIOUS INSTRUCTIONS PROVIDED BY THE PROJECT COORDINATOR EARLIER ABOUT CHAPTER CONTENTS AND ALIGNMENTS. 

FOR ANY QUERIES :CONTACT PROJECT COORDINATOR 9496881321

Tuesday 17 March 2015

FINAL HARD COPY REPORT SAMPLE

Do the alignments, borders, certificate page, front sheets etc as in the following report. Its similar to old reports except certificate page.

MODIFY THE CERTIFICATE AS IN THIS SAMPLE REPORT.


DOWNLOAD FINAL REPORT SAMPLE

For any queries / doubts contact 9496881321(Pramod)

Saturday 14 March 2015

TIPS IN REPORT MAKING


1. NO NEED TO USE UNDERLINES IN CHAPTER HEADINGS.
2. IN ACKNOWLEDGEMENT PAGE
THE HIERARCHY IS            FIRST PRINCIPAL Dr. P SURESHKUMAR
SECOND HOD Prof. MANILAL D L
THIRD PROJECT COORDINATOR (FOR A BATCH  & B BATCH Mr. PRAMOD MATHEW JACOB
                                                            
FOURTH YOUR GUIDE
FIFTH ALL THE FACULTIES OF CSE DEPT.
SIXTH YOUR FRIENDS AND CLASSMATES
SEVENTH YOUR PARENTS
THEN YOU CAN ADD UP ANYONE WHO HELPED TO COMPLETE THIS PROJECT.
3. FOOTER : LEFT: DEPT. OF COMPUTER SCIENCE & ENGINEERING
                      RIGHT: COLLEGE OF ENGINEERING,CHERTHALA
                      CENTRE: PAGE NUMBER
    HEADER: LEFT: MINI PROJECT REPORT  2014-2015
                     RIGHT : YOUR PROJECT TITLE
NOTE: HEADERS AND FOOTERS ARE NOT NEEDED IN THE FIRST PAGES OF REPORT TILL THE FIRST CHAPTER PAGE. ie. CHAPTER 1 . INTRODUCTION PAGE SHOULD BE YOUR FIRST PAGE WITH PAGE NUMBER 1.

4. REFERENCES SHOULD BE YOUR LAST CHAPTER. AFTER THAT NO CHAPTER NUMBERS. APPENDIX SHOULD BE ADDED AFTER REFERENCES. INDEX SHOULD BE THE LAST SECTION IN YOUR REPORT.
5. A BRIEF DESCRIPTION SHOULD BE ADDED AT THE BOTTOM OF EVERY SCREEN SHOTS, DFDs, GANTT CHARTS etc.
6.FIGURE AND ITS EXPLANATION SHOULD BE IN THE SAME PAGE. DIAGRAMS, SCREEN SHOTS, TABLES SHOULD BE CENTRE ALIGNED.
7. LIST OF ABBREVIATIONS SHOULD BE IN ALPHABETIC ORDER.
8. INDEX SHOULD CONTAIN ALL THE KEYWORDS IN YOUR REPORT.( Should be atleast three pages with two column format )

FOR ANY QUERIES MEET YOUR PROJECT COORDINATOR or dial 9496881321